boiler burner
panipat, haryana
- conversion of one 150 tph bhel supplied vu-40 coal-fired boiler to 100% natural gas firing with provision for biogas co-firing in the newly designed burners, including basic design, detailed engineering, procurement, supply, fabrication and handing over
- Authority : Department Of Fertilisers
- Deadline : 31 Oct 2026
- Value : 88.60 Crores
- Download
manugurq, telangana
- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
- Authority : Telangana Power Generation Corporation Limited
- Deadline : 02 Nov 2026
- Value : 9.40 Lac
- Download
mettur, tamil nadu
- mtps i bm unit iv pressure parts removal of deteriorated and peeled of insulation and reinsulation of boiler burner corners and sadc with new insulation
- Authority : Tamil Nadu Electricity Board
- Deadline : 04 Nov 2026
- Value : Refer Document
- Download
mettur, tamil nadu
- mtps i bm unit iv boiler pressure parts aoh 2026 rectification replacement of defective tubes in burner corner water wall tubes and bends and fin welding at boiler i st pass area
- Authority : Tamil Nadu Electricity Board
- Deadline : 04 Nov 2026
- Value : Refer Document
- Download
mettur, tamil nadu
- mtps i bm unit iv boiler pressure parts aoh 2026 maintenance of burners and replacement of worn out fasteners at cover plates
- Authority : Tamil Nadu Electricity Board
- Deadline : 03 Nov 2026
- Value : Refer Document
- Download
ambattur, tamil nadu
- nctps ii - m i circle - bm division - unit i 600 mw boiler - overhauling of coal / oil burner assemblies and burner tilting mechanism in corner - 2 during aoh of the year 2026-27
- Authority : Tamil Nadu Electricity Board
- Deadline : 03 Nov 2026
- Value : Refer Document
- Download
ambattur, tamil nadu
- bm division - unit i 600 mw boiler - annual overhauling of coal / oil burner assemblies and burner tilting mechanism in corner - 4 during aoh of the year 2026-27
- Authority : Tamil Nadu Electricity Board
- Deadline : 04 Nov 2026
- Value : Refer Document
- Download
ambattur, tamil nadu
- bm division - unit i 600 mw boiler - annual overhauling of coal / oil burner assemblies and burner tilting mechanism in corner 3 during aoh of the year 2026-27
- Authority : Tamil Nadu Electricity Board
- Deadline : 03 Nov 2026
- Value : Refer Document
- Download
ambattur, tamil nadu
- nctps ii - m-i circle bm 600 mw - unit-i boiler - charges for replacement of internally corroded and severely damaged water wall tubes and bends in rhs water wall at below the burner area during annual overhaul 2026-27
- Authority : Tamil Nadu Electricity Board
- Deadline : 10 Nov 2026
- Value : Refer Document
- Download
ambattur, tamil nadu
- bm 600 mw - unit-i boiler - charges for replacement of internally corroded and severely damaged water wall tubes and bends in rear side water wall at burner area during annual overhaul 2026-27
- Authority : Tamil Nadu Electricity Board
- Deadline : 10 Nov 2026
- Value : Refer Document
- Download
ambattur, tamil nadu
- 600 mw - unit-i boiler - charges for replacement of internally corroded and severely damaged water wall tubes and bends in lhs water wall nearer to corner-01 at below the burner area during annual overhaul 2026-27
- Authority : Tamil Nadu Electricity Board
- Deadline : 10 Nov 2026
- Value : Refer Document
- Download
ambattur, tamil nadu
- unit-i boiler - charges for replacement of internally corroded and severely damaged water wall tubes and bends in lhs water wall nearer to corner-02 at below the burner area during annual overhaul 2026-27
- Authority : Tamil Nadu Electricity Board
- Deadline : 10 Nov 2026
- Value : Refer Document
- Download
ambattur, tamil nadu
- nctps ii - m i circle - bm division - unit i 600 mw boiler - overhauling of coal / oil burner assemblies and burner tilting mechanism in corner - 1 during aoh of the year 2026-27
- Authority : Tamil Nadu Electricity Board
- Deadline : 03 Nov 2026
- Value : Refer Document
- Download
ambattur, tamil nadu
- unit i 600 mw boiler providing cup lock metallic scaffolding arrangements inside the boiler furnace from 43 mtr (burner top) to 79 mtr (radiant roof) elevation and cleaning of boiler i pass heating surface tubes above wwsb area to 79 mtr
- Authority : Tamil Nadu Electricity Board
- Deadline : 09 Nov 2026
- Value : Refer Document
- Download
ambattur, tamil nadu
- unit i 600 mw boiler providing cup lock metallic scaffolding arrangements inside the boiler furnace from 11 mtr to 43 mtr burner top and cleaning of boiler i pass heating surface tubes from 11 mtr el upto wwsb area elevation by high pressure
- Authority : Tamil Nadu Electricity Board
- Deadline : 09 Nov 2026
- Value : Refer Document
- Download
robertsganj, uttar pradesh
- custom bid for services- service contract for overhauling of boiler pressure parts, valves and burner
- Authority : National Thermal Power Corporation Limited
- Deadline : 05 Nov 2026
- Value : Refer Document
- Download
mettur, tamil nadu
- overhauling of secondary air dampers tertiary air dampers burner cooling air dampers and ofa in boiler wind box area of front rear side
- Authority : Tamil Nadu Electricity Board
- Deadline : 02 Nov 2026
- Value : Refer Document
- Download
housekeeping tenders from :
